Piper’s Hobby

Grandpa calls for Piper’s help whenever he’s ready to bottle the new batch of wine. 

First, she helps prep the bottles.

P1050186

Then, she uses a syphon to fill them.

P1050187

Next,  it’s time to secure the bottle cap.

P1050192

Finally, the bottles get a personalized label.

P1050193

Nice Job, little Elf!

Whidbey Walk

After a drenching 24 hours, we woke to cold blue skies. So I took myself for a walk around the long beach loop.  The island is still magical to me, as an eagle soared overhead and the fresh snow on the Cascades stood out against the blue water.  Love this place!WP_20171220_11_59_36_Pro

WP_20171220_12_01_35_Pro

Cabin Shots

The cabin wasn’t rented as much the first half of December , so we got a few days there.  The kids spent time building and playing.

Kyla was proud of her tower.

12-9 Kyla cabin

Wesley did the same the next week, and threw in a bedroom barricade to up the ante.

WP_20171219_11_48_07_Pro

WP_20171219_11_48_24_Pro

All the kids got time with their island friends.

Kyla and Elleanor

12-10 At Abigails house

12-9 Piper and Vivian and kitten

Mama’s Latest Project

The upper railing has never really bugged me, but once we finished the kitchen, I got a bee in my bonnet to replace the white metal with black wood.  Our 6” posts are not the actual 5.5” they are supposed to be, so off to Dad’s garage I went to trim down a lot of pieces to 5.25”.  Wesley was thrilled with the scrap pieces it produced.

11-19 Wes in Grandpa's garage11-19 Wes in Grandpa's garage2

I’d rather not recall the many redesigns and miscalculations I made, and have to admit that I needed both my dad and my husband to finish this project.  The part of me that continues forward and finishes is not always a friend to precision and reflection, also known as “wood-working”.  But high gloss black paint covers many an error, and I really like the final result.

Before:

11-27 Railing remodel 1

After:

11-27 Railing remodel 4

Decorated for Christmas (we gave away the buffet that previously displayed the Christmas village):

11-27 Railing remodel 811-27 Railing remodel 711-27 Railing remodel 6